Metro route
Dadar to BKC by metro
A direct journey of 3 stations on the Aqua Line, with no change of train. It takes about 6 min on the train, by our estimate.
First Aqua Line train: First train 5:55 amFrom Cuffe Parade and from Aarey JVLR SourceOutlook Traveller: Mumbai's Aqua Line fully operational (10 Oct 2025) Checked22 Sep 2026 HistoryNo changes since we started tracking this figure. from the start of the line.
Step by step
Arrive at BKC
3 stations
Journey time is our rough estimate from the number of stations and changes, not a timetable. Add time to wait for the train.
Fare
Fares go up with the distance you travel.
Fare
Fare
₹10 to ₹70Goes up with distance travelled
SourceOutlook Traveller: Mumbai's Aqua Line fully operational (10 Oct 2025)
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.Goes up with distance travelled
Exact fare: Aqua Line fare chart
Related routes
Sources
Where the information on this page comes from.
- Outlook Traveller: Mumbai's Aqua Line fully operational (10 Oct 2025) Checked 22 Sep 2026
- Wikipedia: Aqua Line (Mumbai Metro) Checked 22 Sep 2026
Spotted something out of date?Tell us which station or figure changed and where you saw it.
Report an errorHow to report