MetroDost
Metro stationLine 7

Magathane Metro Station

मागाठाणे

Elevated station on Line 7, between Poisar and Devipada.

Last checked 11 Oct 2026
Line
Line 7
Station 10 of 14
Type
Elevated
Platforms
2 side
Opened
2 Apr 2022
Plan a trip from here

Timings

First and last trains for the whole line. Trains reach this station a few minutes later.

Line 7
First train from GundavaliRuns through to Kashigaon on Line 9
Last train from Gundavali
First train from Kashigaon
Last train from Kashigaon
Trains everyPeak hours, through trains between Gundavali and Kashigaon (5 minutes 50 seconds in the timetable); every 8 to 10 minutes at other times.

Fares

Minimum fare

Exact fare from Magathane: Line 7 fare chart

Facilities

Step-free accessParking

On the line

Line 7
  1. 7 more stations towards Gundavali
  2. Akurli
  3. Poisar
  4. MagathaneYou are here
  5. Devipada
  6. Rashtriya Udyan
  7. 2 more stations towards Dahisar East

Open Magathane Metro Station in Google Maps

Sources

Where the information on this page comes from.

Spotted something out of date?Tell us which station or figure changed and where you saw it.

Report an errorHow to report