Metro stationAqua Line
Kalbadevi Metro Station
Underground station on the Aqua Line, between CSMT and Girgaon.
Last checked 22 Sep 2026
Line
Aqua Line
Station 6 of 27
Type
Underground
Opened
9 Oct 2025
Plan a trip from here
Timings
First and last trains for the whole line. Trains reach this station a few minutes later.
First train
First train
5:55 amFrom Cuffe Parade and from Aarey JVLR
SourceOutlook Traveller: Mumbai's Aqua Line fully operational (10 Oct 2025)
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.From Cuffe Parade and from Aarey JVLR
Last train
Last train
10:30 pmFrom Cuffe Parade and from Aarey JVLR
SourceOutlook Traveller: Mumbai's Aqua Line fully operational (10 Oct 2025)
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.From Cuffe Parade and from Aarey JVLR
Fares
Fare
Fare
₹10 to ₹70Goes up with distance travelled
SourceOutlook Traveller: Mumbai's Aqua Line fully operational (10 Oct 2025)
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.Goes up with distance travelled
Exact fare from Kalbadevi: Aqua Line fare chart
On the line
- 3 more stations towards Cuffe Parade
- Hutatma Chowk
- CSMTCentral lineHarbour line
- KalbadeviYou are here
- Girgaon
- Grant RoadWestern line
- 19 more stations towards Aarey JVLR
Open Kalbadevi Metro Station in Google Maps
Sources
Where the information on this page comes from.
- Outlook Traveller: Mumbai's Aqua Line fully operational (10 Oct 2025) Checked 22 Sep 2026
- Wikipedia: Aqua Line (Mumbai Metro) Checked 22 Sep 2026
Spotted something out of date?Tell us which station or figure changed and where you saw it.
Report an errorHow to report