Line 9Partly open
Red Line (Line 9)
Extension of the Red Line north from Dahisar East into Mira-Bhayandar, open as far as Kashigaon. Trains run through from Line 7.
Last checked 11 Oct 2026
Stations
4
Open so far
First train
First train from Gundavali
6:00 amRuns through to Kashigaon on Line 9
SourceMMMOCL: train time table
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.
Runs through to Kashigaon on Line 9
Stations
In order along the line. White rings mark stations where you can change to another line.
- Dahisar EastStart of lineLine 2ALine 7Western line
- Pandurang Wadi
- Miragaon
- KashigaonEnd of line
Timings and frequency
Tap a time to see where it comes from and when we last checked it.
First train from Gundavali
First train from Gundavali
6:00 amRuns through to Kashigaon on Line 9
SourceMMMOCL: train time table
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.Runs through to Kashigaon on Line 9
Last train from Gundavali
Last train from Gundavali
11:00 pm
SourceMMMOCL: train time table
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.
First train from Kashigaon
First train from Kashigaon
5:50 am
SourceMMMOCL: train time table
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.
Last train from Kashigaon
Last train from Kashigaon
10:30 pm
SourceMMMOCL: train time table
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.
Trains every
Trains every
6 minutesPeak hours, through trains between Gundavali and Kashigaon (5 minutes 50 seconds in the timetable); every 8 to 10 minutes at other times.
SourceMMRDA: Lines 9 and 2B open, revised Metro timetable from 8 April 2026 (6 Apr 2026)
Checked11 Oct 2026
HistoryNo changes since we started tracking this figure.Peak hours, through trains between Gundavali and Kashigaon (5 minutes 50 seconds in the timetable); every 8 to 10 minutes at other times.
Fares
Exact fare between any two stations: the operator's fare chart.
Interchanges
Stations on this line where you can change to another line or kind of train.
History
Every opening and change we have recorded for this page.
- 8 Apr 2026OpenedFirst section opens from Dahisar East to Kashigaon, with trains running through from Line 7International Railway Journal: Mumbai opens metro extensions (8 Apr 2026)
Sources
Where the information on this page comes from.
- Wikipedia: Red Line (Mumbai Metro) Read 22 Sep 2026
- MMMOCL: train time table Checked 22 Sep 2026
- MMRDA: Lines 9 and 2B open, revised Metro timetable from 8 April 2026 (6 Apr 2026) Checked 11 Oct 2026
- International Railway Journal: Mumbai opens metro extensions (8 Apr 2026) International Railway Journal
Spotted something out of date?Tell us which station or figure changed and where you saw it.
Report an errorHow to report