MetroDost
Line 9Partly open

Red Line (Line 9)

Extension of the Red Line north from Dahisar East into Mira-Bhayandar, open as far as Kashigaon. Trains run through from Line 7.

Last checked 11 Oct 2026
Stations
4
Open so far
First train
Runs through to Kashigaon on Line 9

Stations

In order along the line. White rings mark stations where you can change to another line.

Timings and frequency

Tap a time to see where it comes from and when we last checked it.

First train from GundavaliRuns through to Kashigaon on Line 9
Last train from Gundavali
First train from Kashigaon
Last train from Kashigaon
Trains everyPeak hours, through trains between Gundavali and Kashigaon (5 minutes 50 seconds in the timetable); every 8 to 10 minutes at other times.

Fares

Exact fare between any two stations: the operator's fare chart.

Interchanges

Stations on this line where you can change to another line or kind of train.

History

Every opening and change we have recorded for this page.

  1. 8 Apr 2026Opened
    First section opens from Dahisar East to Kashigaon, with trains running through from Line 7
    International Railway Journal: Mumbai opens metro extensions (8 Apr 2026)

Sources

Where the information on this page comes from.

Spotted something out of date?Tell us which station or figure changed and where you saw it.

Report an errorHow to report