MetroDost
Line 3Open

Aqua Line (Line 3)

Mumbai's underground line from Cuffe Parade to Aarey JVLR, through Churchgate, CSMT, Dadar, BKC and both airport terminals.

Last checked 22 Sep 2026
Stations
27
9 with connections
Length
End to end
First train
From Cuffe Parade and from Aarey JVLR
Fare
Goes up with distance travelled

Stations

In order along the line. White rings mark stations where you can change to another line.

Timings and frequency

Tap a time to see where it comes from and when we last checked it.

First trainFrom Cuffe Parade and from Aarey JVLR
Last trainFrom Cuffe Parade and from Aarey JVLR

Fares

Fares go up with the distance you travel.

FareGoes up with distance travelled

Exact fare between any two stations: the operator's fare chart.

Interchanges

Stations on this line where you can change to another line or kind of train.

Did you know?

The Aqua Line is Mumbai's first fully underground metro line: 33.5 km from Cuffe Parade to Aarey JVLR, with 27 stations.

Source: Prime Minister's Office, Government of India · checked 29 Oct 2026

More metro facts and records

Places along the line

Landmarks within walking distance of a station on this line.

History

Every opening and change we have recorded for this page.

  1. 9 Oct 2025Opened
    Whole line opens, from Aarey JVLR to Cuffe Parade
    Outlook Traveller: Mumbai's Aqua Line fully operational (10 Oct 2025)
  2. 10 May 2025Opened
    Extended south from BKC to Acharya Atre Chowk
    Wikipedia: Aqua Line (Mumbai Metro)
  3. 7 Oct 2024Opened
    First section opens from Aarey JVLR to BKC
    Wikipedia: Aqua Line (Mumbai Metro)

Sources

Where the information on this page comes from.

Spotted something out of date?Tell us which station or figure changed and where you saw it.

Report an errorHow to report