Line 2AOpen
Yellow Line (Line 2A)
Elevated line along Link Road in the western suburbs, from Dahisar East to Andheri West, where it connects to Line 1 at D.N. Nagar.
Last checked 11 Oct 2026
Stations
17
2 with connections
Length
Length
18.6 km
SourceWikipedia: Yellow Line (Mumbai Metro)
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.
End to end
First train
First train from Dahisar East
6:00 am
SourceMMMOCL: train time table
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.
from Dahisar East
Fares
From
Minimum fare
₹10
SourceMumbai Live: Metro 2A and 7 fares
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.
By distance
Stations
In order along the line. White rings mark stations where you can change to another line.
Timings and frequency
Tap a time to see where it comes from and when we last checked it.
First train from Dahisar East
First train from Dahisar East
6:00 am
SourceMMMOCL: train time table
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.
Last train from Dahisar East
Last train from Dahisar East
10:35 pm
SourceMMMOCL: train time table
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.
Last train from Andheri West
Last train from Andheri West
11:00 pm
SourceMMMOCL: train time table
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.
Trains every
Trains every
6 minutesPeak hours, Dahisar East to Andheri West; every 8 to 10 minutes at other times.
SourceMMRDA: Lines 9 and 2B open, revised Metro timetable from 8 April 2026 (6 Apr 2026)
Checked11 Oct 2026
HistoryNo changes since we started tracking this figure.Peak hours, Dahisar East to Andheri West; every 8 to 10 minutes at other times.
Fares
Fares go up with the distance you travel.
Minimum fare
Minimum fare
₹10
SourceMumbai Live: Metro 2A and 7 fares
Checked22 Sep 2026
HistoryNo changes since we started tracking this figure.
Exact fare between any two stations: the operator's fare chart.
Interchanges
Stations on this line where you can change to another line or kind of train.
History
Every opening and change we have recorded for this page.
- 8 Apr 2026UpdateLines 2A and 7 now run as separate lines, with new timetables across the networkInternational Railway Journal: Mumbai opens metro extensions (8 Apr 2026)
- 19 Jan 2023OpenedExtended south from Dahanukarwadi to Andheri WestWikipedia: Yellow Line (Mumbai Metro)
- 2 Apr 2022OpenedFirst section opens from Dahisar East to DahanukarwadiWikipedia: Yellow Line (Mumbai Metro)
Sources
Where the information on this page comes from.
- MMMOCL: train time table Checked 22 Sep 2026
- MMRDA: Lines 9 and 2B open, revised Metro timetable from 8 April 2026 (6 Apr 2026) Checked 11 Oct 2026
- Mumbai Live: Metro 2A and 7 fares Checked 22 Sep 2026
- Wikipedia: Yellow Line (Mumbai Metro) Checked 22 Sep 2026
- International Railway Journal: Mumbai opens metro extensions (8 Apr 2026) International Railway Journal