Line 12Being built
Orange Line (Line 12)
Being built: Kalyan to Taloja, 22.2 km. Stations will be added here as the line opens.
Being built
Being built: Kalyan to Taloja, 22.2 km. Stations will be added here as the line opens.
This page switches to the full station list and timings on the day the line opens.
History
Every opening and change we have recorded for this page.
No changes recorded yet.
Sources
Where the information on this page comes from.
- The Metro Rail Guy: Mumbai Metro status The Metro Rail Guy
Spotted something out of date?Tell us which station or figure changed and where you saw it.
Report an errorHow to report