Metro route
Nagasandra to BTM Layout by metro
23 stations with 1 change, using Green Line and Yellow Line. It takes about 50 min on the train, by our estimate.
Stations
23
After boarding
Changes
1
Change of line
Journey time
~50 min
Our estimate
Step by step
Get off at Rashtreeya Vidyalaya Road
20 stations · change here
Board Yellow Line at Rashtreeya Vidyalaya Road
Yellow Line Towards Delta Electronics Bommasandra
2 stations in between
Arrive at BTM Layout
3 stations
Journey time is our rough estimate from the number of stations and changes, not a timetable. Add time to wait for the train.
Fare
Each line has its own operator and fare, unless you use a combined ticket.
Minimum fare
Minimum fare
₹10Token fare, up to 2 km. Smart cards cost a little less.
SourceDeccan Herald: Public backlash forces Namma Metro to revise fares, hike capped at 71% (13 Feb 2025)
Checked9 Oct 2026
HistoryNo changes since we started tracking this figure.Token fare, up to 2 km. Smart cards cost a little less.
Maximum fare
Maximum fare
₹90Token fare for the longest journeys. Smart cards cost a little less.
SourceDeccan Herald: Public backlash forces Namma Metro to revise fares, hike capped at 71% (13 Feb 2025)
Checked9 Oct 2026
HistoryNo changes since we started tracking this figure.Token fare for the longest journeys. Smart cards cost a little less.
Minimum fare
Minimum fare
₹10Token fare, up to 2 km. Smart cards cost a little less.
SourceDeccan Herald: Public backlash forces Namma Metro to revise fares, hike capped at 71% (13 Feb 2025)
Checked9 Oct 2026
HistoryNo changes since we started tracking this figure.Token fare, up to 2 km. Smart cards cost a little less.
Maximum fare
Maximum fare
₹60R.V. Road to Bommasandra, token fare. Smart cards cost a little less.
SourceThe Week (PTI): PM Modi inaugurates the Yellow Line of Bangalore Metro (10 Aug 2025)
Checked9 Oct 2026
HistoryNo changes since we started tracking this figure.R.V. Road to Bommasandra, token fare. Smart cards cost a little less.
Sources
Where the information on this page comes from.
- Daily Jagran: Bengaluru Metro Yellow Line trains to start at 6 am (10 Sep 2025) Checked 9 Oct 2026
- Deccan Herald: Peak-hour frequency on Namma Metro Yellow Line improves (2 Jun 2026) Checked 11 Oct 2026
- Deccan Herald: Public backlash forces Namma Metro to revise fares, hike capped at 71% (13 Feb 2025) Checked 9 Oct 2026
- The Week (PTI): PM Modi inaugurates the Yellow Line of Bangalore Metro (10 Aug 2025) Checked 9 Oct 2026
- The Tribune: IPL 2026: BMRCL extends metro timings for the season opener in Bengaluru (26 Mar 2026) Checked 9 Oct 2026
Spotted something out of date?Tell us which station or figure changed and where you saw it.
Report an errorHow to report