MetroDost
Line 2Open

Green Line

North-south line running from Madavara in the north-west through Yeshwanthpur and Majestic to Silk Institute in the south.

Last checked 9 Oct 2026
Stations
32
2 with connections
Fares
to
By distance

Stations

In order along the line. White rings mark stations where you can change to another line.

Timings and frequency

Tap a time to see where it comes from and when we last checked it.

Last trainFrom the terminal stations on regular days; later on some match and festival days.

Fares

Fares go up with the distance you travel.

Minimum fareToken fare, up to 2 km. Smart cards cost a little less.
Maximum fareToken fare for the longest journeys. Smart cards cost a little less.

Interchanges

Stations on this line where you can change to another line or kind of train.

Places along the line

Landmarks within walking distance of a station on this line.

History

Every opening and change we have recorded for this page.

  1. 7 Nov 2024Opened
    Extended north from Nagasandra to Madavara
    Wikipedia: Green Line (Namma Metro)
  2. 15 Jan 2021Opened
    Extended south from Yelachenahalli to Silk Institute
    Wikipedia: Green Line (Namma Metro)
  3. 18 Jun 2017Opened
    Extended from Majestic (Nadaprabhu Kempegowda Station) south to Yelachenahalli
    Wikipedia: Green Line (Namma Metro)
  4. 1 May 2015Opened
    Extended north to Nagasandra
    Wikipedia: Green Line (Namma Metro)
  5. 1 Mar 2014Opened
    First section opens from Mantri Square Sampige Road to Peenya Industry
    Wikipedia: Green Line (Namma Metro)

Sources

Where the information on this page comes from.

Spotted something out of date?Tell us which station or figure changed and where you saw it.

Report an errorHow to report