MetroDost
Line 2Open

Red Line

Elevated north-south line from Motera Stadium through Sabarmati, Ranip and Usmanpura to APMC in the south.

Last checked 2 Nov 2026
Stations
14
2 with connections
Length
End to end
First train
From APMC.

Stations

In order along the line. White rings mark stations where you can change to another line.

Timings and frequency

Tap a time to see where it comes from and when we last checked it.

First trainFrom APMC.
Last trainFrom APMC; 11:00 pm from Koteshwar Road towards APMC.

Interchanges

Stations on this line where you can change to another line or kind of train.

History

Every opening and change we have recorded for this page.

  1. 30 Sep 2022Opened
    Opens from Motera Stadium to APMC (without Sabarmati Railway Station)
    Wikipedia: Red Line (Ahmedabad Metro)

Sources

Where the information on this page comes from.

Spotted something out of date?Tell us which station or figure changed and where you saw it.

Report an errorHow to report