Line 2Open
Red Line
Elevated north-south line from Motera Stadium through Sabarmati, Ranip and Usmanpura to APMC in the south.
Last checked 2 Nov 2026
Stations
14
2 with connections
Length
Length
18.87 kmMotera Stadium to APMC.
SourceGujarat Metro Rail: Project overview
Checked2 Nov 2026
HistoryNo changes since we started tracking this figure.
End to end
First train
First train
6:20 amFrom APMC.
SourceDeshGujarat: GMRC updates frequency schedule; Koteshwar Road new terminal (21 Jan 2026)
Checked9 Oct 2026
HistoryNo changes since we started tracking this figure.
From APMC.
Stations
In order along the line. White rings mark stations where you can change to another line.
Timings and frequency
Tap a time to see where it comes from and when we last checked it.
First train
First train
6:20 amFrom APMC.
SourceDeshGujarat: GMRC updates frequency schedule; Koteshwar Road new terminal (21 Jan 2026)
Checked9 Oct 2026
HistoryNo changes since we started tracking this figure.From APMC.
Last train
Last train
11:10 pmFrom APMC; 11:00 pm from Koteshwar Road towards APMC.
SourceDeshGujarat: Ahmedabad–Gandhinagar Metro to run for longer hours from May 18 (16 May 2026)
Checked9 Oct 2026
HistoryNo changes since we started tracking this figure.From APMC; 11:00 pm from Koteshwar Road towards APMC.
Interchanges
Stations on this line where you can change to another line or kind of train.
History
Every opening and change we have recorded for this page.
- 30 Sep 2022OpenedOpens from Motera Stadium to APMC (without Sabarmati Railway Station)Wikipedia: Red Line (Ahmedabad Metro)
Sources
Where the information on this page comes from.
- Wikipedia: Red Line (Ahmedabad Metro) Read 22 Sep 2026
- DeshGujarat: GMRC updates frequency schedule; Koteshwar Road new terminal (21 Jan 2026) Checked 9 Oct 2026
- DeshGujarat: Ahmedabad–Gandhinagar Metro to run for longer hours from May 18 (16 May 2026) Checked 9 Oct 2026
- Gujarat Metro Rail: Project overview Checked 2 Nov 2026
- Gujarat Metro Rail: Route and train timings sheet Gujarat Metro Rail
- Gujarat Samachar: Ahmedabad Metro services extended till 11 pm from May 18 (17 May 2026) Gujarat Samachar
Spotted something out of date?Tell us which station or figure changed and where you saw it.
Report an errorHow to report